Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Progress of general control system for Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Takada, Hiroshi; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

JAEA-Technology 2018-011, 57 Pages, 2019/01

JAEA-Technology-2018-011.pdf:4.98MB

For safely and efficiently operating a spallation neutron source and a muon target, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF). GCS administers operation processes and interlocks of many instruments. It consists of several subsystems such as an integral control system (ICS), interlock systems (ILS), shared servers, network system, and timing distribution system (TDS). Although GCS is an independent system that controls the target stations, it works closely with the control systems of the accelerators and other facilities in J-PARC. Since the first beam injection, GCS has operated stably without any serious troubles after modification based on commissioning for operation and control. Then, significant improvements in GCS such as upgrade of ICS by changing its framework software and function enhancement of ILS were proceeded until 2015. In this way, many modifications have been proceeded in the entire GCS during a period of approximately ten years after start of beam operation. Under these situation, it is important to comprehend upgrade history and present status of GCS in order to decide its upgrade plan. This report summarizes outline, structure, roles and functions of GCS in 2017.

Journal Articles

Progress of the general control system for the Materials and Life Science Experimental Facility in J-PARC

Sakai, Kenji; Oi, Motoki; Watanabe, Akihiko; Kai, Tetsuya; Kato, Yuko; Meigo, Shinichiro; Takada, Hiroshi

JAEA-Conf 2015-002, p.593 - 598, 2016/02

For safe and stable beam operation, a MLF general control system (GCS) consists of several subsystems such as an integral control, interlock, server, network, and timing distribution systems. Since the first beam injection in 2008, the GCS has operated stably without any serious troubles in comparison with upgrade of target devices for ramping up beam power and increment of user apparatuses year by year. In recent years, however, it has been improved significantly in view of sustainable long-term operation and maintenance. The monitor and operation system of the GCS has been upgraded by changing its framework software to improve potential flexibility in its maintenance. Its interlock system was also modified in accordance with the re-examination of the risk management system of J-PARC. This paper reports recent progress of the MLF-GCS.

2 (Records 1-2 displayed on this page)
  • 1